info@eventosglobales.com.arWhatsApp · +54 9 11 5626-6200

← Back to guides and resources

Reference documentation · Video, LED and playback

Tessera T1: reuse the system for its mode and output

Prepare the DVI-D source, canvas and output path. Check what changes in Low Latency and define the continuity required for the event.

These guides help you prepare and check your production systems. Documented models are technical references; enquire about the equipment and services we can prepare for your project.

Let’s prepare the T1 your production supplies

Tell us what you want to show, what the event supplies and whether sources will change or cameras are involved. We can evaluate supplementary equipment rental or purchase and content preparation, conversion, configuration and operation services in Argentina. Start with label photos and approximate size; formats and mapping can follow.

What we define for a quote

Separate equipment, content and playback from tile association and operation. Review format, mode, output loading, synchronization and interruptions the fallback must cover. If another function or continuity is required, compare an architecture compatible with the identified panels and agree how it will be tested.

Model and application

T1 is a Tessera processor with DVI-D input and 1 Gigabit LED output. Image processing depends on the mode; do not transfer S4, S8, or SX40 capabilities merely because software is shared.

Signal and optics

Input
DVI-D; documentation specifies up to 1920 × 1080 at 60 Hz. An adapter’s connector shape does not establish compatible timing or color.
Panels
Requires Tessera-compatible panels and their Fixture Pack. Confirm model, receiver, versions, and the existing system project.
Control
Management network and panel outputs serve different functions. DisplayPort supports the local interface, not show video input.

System preparation

  1. Preserve project, versions, and panel association before changing the installation.
  2. Define canvas, crop, and supported format; check whether the active mode supports the intended processing.
  3. Compare pattern, physical topology, and each panel’s placement; record position changes.
  4. Rehearse synchronization and transitions through the full chain; keep working settings.

Planning questions

What do we need to reuse T1 with a rental screen?

Start with panel, receiver, project and versions, plus output format and loading. We can prepare content, signal and operation using compatible equipment. Compare another solution before defining supply when a function or continuity requirement calls for it.

Why might scaling be unavailable?

T1 supports scaling in normal operation, but Low Latency disables it along with other features. The manual also states that some nonstandard canvases trigger that mode. Record project and mode before testing; compare content prepared for the canvas or upstream processing if that condition must be retained.

Can a newer processor replace T1 without reconfiguration?

Compare compatible panels, Fixture Pack, project, input, load, and timing first. More outputs or different connectors do not establish functional equivalence or direct project transfer. Prepare recovery and test every destination; when combining processors, review synchronization and total delay.

Must we redraw everything after moving panels?

Save the project and compare which units and connections changed. Panel association must match the physical installation; do not assume the previous topology is correct merely because everything is connected. An identified zone check helps plan reassociation without erasing existing work by trial and error.

Should we update or reset to make panels appear?

First check panel type, Fixture Pack, and versions. Factory reset can delete projects and additional packs; updates also have compatibility prerequisites. Prepare documented work with recovery instead of using reset as live-show diagnosis.

Does the single output support closed-loop backup?

T1 has a single output and its documentation excludes closed-loop redundancy. Tell us which interruption must be covered: evaluate source, distribution and a compatible architecture with rehearsed recovery, distinguishing project backup from display continuity.

Checks by symptom

Brompton Tessera T1
Static image in the wrong positionCompare project, association, and actual panel placement.
Motion out of sync across systemsCompare source, reference, modes, and every processor’s delay.
Source has no pictureCompare DVI, format, and converters; separate input signal from panel connection.

Use and safety

Preserve projects and packs before reset, upgrade, or reassociation. Confirm version prerequisites in official documentation.

Prepare rack, ventilation, power, and screen mounting under the exact system’s documentation.

Record the system and rehearsal result

Use the existing LED worksheet to retain project, versions, source and path. Add active mode, canvas format, required processing and pattern/content results. Agree who accepts image and synchronization and which configuration is restored.

Download the existing LED worksheet (.txt)

Leave details undefined where needed. The worksheet downloads blank; retain your copy and describe the need in Contact. Preparing a worksheet or draft does not send an enquiry.

Continue with the identified component

Each guide retains its model and edition. Identify the actual unit’s platform before combining equipment, projects or files.

Documents by model, revision and platform

Consult T1 and Low Latency Mode for image processing. Redundancy documentation distinguishes the single-output limitation. Check system timing when combining processors.

Documentation consulted

Review: October 30, 2026. Official T1 product/hardware, Low Latency, redundancy, library and processor-combination HTML consulted. No configuration, update or physical rehearsal.

Let’s prepare your event system

Tell us what you want to show, hear or light and what your production already provides. Start with the idea and add models, dimensions and schedules later. Mention the model or guide in your message; the related service is selected in Contact.

Enquire about equipment and servicesView the related serviceEvent preparation guide