Let’s work with the display already at the event
If the venue or production already supplies a display and S4, tell us which content and sources you want connected. We can evaluate supplementary equipment rental or purchase and signal adaptation, content preparation, configuration and operation. Start with available label and connection photos without a finished pixel map.
What we agree for the proposal
Review what the venue supplies and who approves content, conversion, mapping and operation. Compare canvas-matched files, a prepared source or compatible upstream processing. If the main processor needs scaling or another input, evaluate a different processor against the actual panels. The proposal separates equipment, preparation, connection, rehearsal and operation.
Model and application
S4 is a Tessera processor with DVI-D input and 4 Gigabit LED outputs. Its low-latency operation excludes scaling, deinterlacing, and frame-rate conversion; prepare the format at the source or in a compatible upstream device.
Signal and optics
- Input
- DVI-D; documentation specifies up to 1920 × 1080 at 60 Hz. An adapter’s connector shape does not establish compatible timing or color.
- Panels
- Requires Tessera-compatible panels and their Fixture Pack. Confirm model, receiver, versions, and the existing system project.
- Control
- Management network and panel outputs serve different functions. DisplayPort supports the local interface, not show video input.
System preparation
- Preserve project, versions, and panel association before changing the installation.
- Identify input, source, format, and converters; prepare content for the canvas without assuming internal scaling.
- Compare pattern, physical topology, and each panel’s placement; record position changes.
- Rehearse synchronization and transitions through the full chain; keep working settings.
Planning questions
Can we use S4 with an existing screen?
Yes. Start by identifying panel, receiver, project and versions and checking the required modes. Verify Tessera compatibility across the system; the network connector shape does not establish it. That information lets us prepare the signal path, supplementary equipment and operation.
How do we fill the screen when the source has another size?
S4 does not scale in its operating mode. Assess content prepared for the canvas or a compatible upstream scaler. Compare margins and cropping with design to preserve proportions; moving panels within a project does not replace that processing.
Can mapping fix an offset between screen areas?
First distinguish incorrect panel placement from a time offset. A static pattern checks mapping and association; motion tests and the full signal path help assess timing. For combined processors, the manufacturer requires synchronized sources and matched delays. Plan adjustments for the exact system outside the show.
Must we redraw everything after moving panels?
Save the project and compare which units and connections changed. Panel association must match the physical installation; do not assume the previous topology is correct merely because everything is connected. An identified zone check helps plan reassociation without erasing existing work by trial and error.
Should we update or reset to make panels appear?
First check panel type, Fixture Pack, and versions. Factory reset can delete projects and additional packs; updates also have compatibility prerequisites. Prepare documented work with recovery instead of using reset as live-show diagnosis.
What can we request to rent or supplement the system?
Tell us what the event supplies, what must appear and who provides the sources. We can prepare supplementary equipment rental or purchase, conversion or scaling upstream of S4, and display configuration or operation. Compare another architecture against the identified panels and content when it better suits the work.
Checks by symptom
| Static image in the wrong position | Compare project, association, and actual panel placement. |
|---|---|
| Motion out of sync across systems | Compare source, reference, modes, and every processor’s delay. |
| Source has no picture | Compare DVI, format, and converters; separate input signal from panel connection. |
Use and safety
Preserve projects and packs before reset, upgrade, or reassociation. Confirm version prerequisites in official documentation.
Prepare rack, ventilation, power, and screen mounting under the exact system’s documentation.
Use the LED worksheet and define the rehearsal result
Record source and physical output, adapters or converters, format received at DVI-D, canvas size and prepared content. Keep a pattern and actual sample. Agree which image must appear complete, which crop design approves and who accepts timing and transitions.
Download the existing LED worksheet (.txt)
Leave details undefined where needed. The worksheet downloads blank; retain your copy and describe the goal in Contact. Preparing the worksheet or opening the form does not send an enquiry.
Compare the path and identified platform
Each guide retains its model and scope. If the panel uses another platform, follow its documentation before proposing a replacement processor.
Official model and feature documentation
S4 and Low Latency Mode sections explain the input and processing to prepare upstream. For multiple surfaces, check synchronization and delay against documentation for the actual combination.
Documentation consulted
Review: October 30, 2026. S4 hardware, Low Latency Mode, Combining Processors and Fixture Library checked in official HTML. Verify format with the actual source and setup; no physical test.
