Model, version and capacity
The reference is Avolites Diamond 9 D9-215 with two main screens; the family manual also shows the D9-330, which has a different surface. Session functions were reviewed in Titan 19.0 on October 31, 2026. Record model and software for both actual stations before transferring a procedure.
The Titan 19.0 table assigns D9 32 locally processed lines and a 64-line system limit; extra processing requires TNP. These numbers are not XLR connector counts and do not establish a second console’s capacity. Separate processing resources, output destinations and operator access to essential controls.
D9-215 · product · Titan 19.0 · Diamond 9 · Titan 19.0 · DMX Settings
Program application
For a festival or presentation with several operators, start with responsibilities: who prepares front light, who controls the background and who coordinates room changes with the venue. Record program moments requiring a shared decision. This is a project-planning framework, not a completed installation or evidence of availability.
Three layers to compare before a handover
| System layer | Record on the D9-215 | Compare on the replacement station |
|---|---|---|
| File and programming | Approved show, Titan version and independent copy. | Received file, version and elements still requiring review. |
| Surface and operator | User, Handle World, pages and controls for each area. | Where the essential controls will remain accessible. |
| Output and receiver | Titan line → XLR or protocol/universe → node and destination. | Path transmitting during handover and expected response at each destination. |
Check the output path at each destination
DMX Settings links lines to physical connectors or Art-Net/sACN destinations. Keep this map with the patch and fixture layout. Where network or fiber is involved, identify connectors, accessories and remote endpoint for the actual unit: this guide does not transfer network options from another generation. Continuity is checked at receivers, rather than only on a session display.
Handle Worlds organize controls; they do not isolate fixtures
Handle Worlds organize layouts; another user’s Programmer may continue affecting output. Agree responsibilities by area and how shared changes are communicated; do not treat a different layout as exclusive control over fixtures.
Titan 19.0 · Multi-User Operation
Prepare a takeover and return test
- Preserve an independent copy of the approved show and the roles, pages and output map. Define who approves changes and the state to return to.
- Before linking stations, compare Titan version and capacity: the manual requires the same version and a backup with no lower system limit or fewer licensed lines than the main console. Also check required processing and surface.
- Document main station, backup, network, nodes and destinations. Distinguish a showfile copy from a synchronized backup session; they are different resources in the plan.
- Agree representative program cues and a minimum control route on the replacement surface. Test access without relying on two models having the same physical arrangement.
- During a technical window, plan takeover and return with coordinated operators. The manual describes Takeover as changing the transmitting station; record what each destination actually receives, issues and observed timing. This guide ran no session and demonstrates no uninterrupted handover.
Frequently asked questions
Does a D9-215 operate exactly like a D9-330?
The family shares Titan, but the surfaces differ. Prepare pages and control access for the actual model; opening a file alone does not approve a transfer.
Does a USB copy provide running show backup?
It preserves a file but demonstrates neither a synchronized second station nor a prepared transmitting route. Define the required scope and how it will be checked.
Can any smaller Titan console replace it?
Brand alone cannot establish that. Review the manual’s version, system-limit and licensed-line conditions, plus the processing and controls needed by the program.
Do different users prevent one affecting another’s work?
Do not assume that. Agree layout and operational responsibility; programmers and active controls require coordinated review.
What helps start a proposal?
Tell us the date, venue, areas and approximate operator count. Add control model and file/versions if available. Preparation, distribution, programming and operation can be evaluated for the agreed scope.
Other parts of control and distribution
Official version-specific documentation
Consult the D9-215 product page and Titan 19.0 chapters on the manufacturer’s site. Links open English online documentation. If your console runs another version, select that manual edition and verify connectors and accessories on the actual unit.
