info@eventosglobales.com.arWhatsApp · +54 9 11 5626-6200

← Back to guides and resources

Reference documentation · Video, LED and playback

NovaStar NovaPro UHD Jr: source, EDID and LED layers

Prepare a stand, conference or stage from source format through layers and LED mapping. The reference is NovaPro UHD Jr User Manual V1.5.0; the Jr suffix and document edition are part of the identification.

These guides help you prepare and check your production systems. Documented models are technical references; enquire about the equipment and services we can prepare for your project.

Choosing the signal path for your event

Tell us what must appear on screen and what your team supplies. We can prepare a display, video and playback proposal with the configuration, rehearsal and operation tasks your project needs. For an existing display, use its map and files to identify which part of the path to complete.

To combine a presentation and video, define content areas and the relationship between source, layer and screen. Agree margins or cropping with the design team and rehearse changes using the actual files before opening the room.

Model and application

The documented name is NovaPro UHD Jr: an all-in-one video processor and LED sending controller. Confirm that label before applying NovaPro UHD or other variant data. Processing a 4K source does not identify the screen’s physical pixels.

Signal and optics

Input
HDMI, DP, DVI, and SDI have their own tables and functions. Verify the complete format and connector before defining the source.
Sending
16 LED Ethernet ports; nominal capacity 10.4 million pixels under documented conditions. Bit depth and per-port limits affect sizing.
Image
Input resolution, layer size, and LED mapping are different settings. Monitor and loop outputs do not replace cabinet data outputs.

System preparation

  1. Record cabinets, receivers, pixels per cabinet, layout, and wiring by port; preserve current files and settings.
  2. Define canvas, source format, layers, crop, and text size before adjusting scaling.
  3. Test pattern and source separately and check every area against a known visual reference.
  4. Rehearse source changes and recovery with the operator; keep an identified copy of the working configuration.
Can I fill a canvas with a different shape from the computer output?

The scaler can fit the layer to the canvas, but first choose whether to keep proportions with margins, crop, or create custom content. Filling the surface adds no source detail and may distort logos or text if their proportions change.

What if the computer rejects a custom resolution?

Keep working settings and record the requested complete format, port, version, and rejection messages. Compare computer output with the controller’s received format and try a direct connection before adding adapters. Canvas capacity does not prove GPU support for that timing; assess a supported standard signal with content arranged within it as an alternative.

Does changing EDID change the cabinets?

EDID communicates input formats to the source; it changes neither the physical matrix nor LED mapping. The manual distinguishes standard and custom resolutions by input and excludes that adjustment for SDI. Plan the test with the actual computer and preserve recovery before applying values.

When is a standard signal better than forcing a format?

If the source or an intermediate device cannot support the intended format, compare a compatible standard signal with agreed framing and scaling. Check margins, crop, and readability with design. Do not stretch content or promise pixel-perfect mapping without checking the full path.

How do we plan a laptop change without improvising?

Define source formats and connections, layer settings, and who performs each change. Rehearse actual content and an alternative source before doors open. An image preset alone does not establish signal, power, or controller backup.

Checks by symptom

Checks by symptom
Complete pattern, cropped sourceCheck layer, crop, and position without changing the cabinet file.
Area missing from pattern tooCompare mapping, load, and actual port path before writing receivers.
New source has no pictureTest a supported format and known direct cable before adding converters or extenders.

Use and safety

Preserve recovery before sending files, saving to receivers, or changing firmware. Confirm versions and compatibility for the exact system.

Prepare power, mounting, and ventilation for screen and rack under their documentation; the processor does not certify those conditions.

What changes with the manual edition

The NovaPro UHD Jr V1.5.0 change history, dated 17 July 2024, removes OPT input, OPT loop and OPT device mode selection. Compare the actual unit, firmware and menus with that edition; do not plan an optical input from V1.4.0 instructions. The document also distinguishes resolution settings for other inputs: SDI does not support that adjustment.

Preparing the enquiry with what is available

You can start with the purpose, city and approximate size. Add models, a pixel plan, cable photos and versions if available. Separate the venue contribution from the equipment and tasks you want to hire. Use the worksheet to record identification and test results.

Download identification and test TXT worksheet

Can I enquire before choosing a controller?

Yes. Tell us what content you want to display, on which surfaces and which part of the system is already arranged. We can help select equipment and services and complete models, dimensions and scheduling later. For an existing system, request the map and original files from the responsible person.

Other guides for comparing signal paths

Each guide applies to its named model and edition. Check system compatibility before combining equipment or transferring a procedure.

Related guide for identifying the variant and scope

Each model has its own inputs, modes and documentation. The comparison helps preparation; it does not assume the models can replace each other in your system.

See NovaPro UHD: PVW and PGM

Compare the video signal path

Manuals and editions

Check the stated model, edition and language at the manufacturer’s source. Verify the document edition and installed software version separately.

Documentation consulted

Document adaptation: October 29, 2026. Check your system model and version before applying changes.

Let’s prepare your event system

Tell us what you want to show, hear or light and what your production already provides. Start with the idea and add models, dimensions and schedules later. Mention the model or guide in your message; the related service is selected in Contact.

Enquire about equipment and servicesView the related serviceEvent preparation guide