Choosing the signal path for your event
Tell us what must appear on screen and what your team supplies. We can prepare a display, video and playback proposal with the configuration, rehearsal and operation tasks your project needs. For an existing display, use its map and files to identify which part of the path to complete.
For a presentation with an already prepared canvas, check the computer output format and the path to the receiving cards. For cameras, multiple computers or size changes, also define who selects, composes or scales those sources before LED sending.
Purpose and covered model
MCTRL660 is a sending controller for LED displays with compatible receiving hardware. It accepts video and distributes it to the tiles, serving installations and events with a defined display configuration.
Check the model label: this guide covers the original MCTRL660. MCTRL660 PRO and MCTRL600 have separate documentation. Identify the receiver, tile and firmware before applying configuration files.
Main connections
- Video
- One HDMI 1.3 input and one SL-DVI input, with corresponding loop outputs for cascading. Progressive signals are supported; the manual excludes interlaced video.
- LED output
- Four Gigabit RJ45 ports feed the receiving system. Do not confuse their data connectors with a network input for device control.
- Control
- USB Type-B connects to a computer; UART IN/OUT provides control cascading. The front has a display, knob and BACK button.
Requirements
Tiles with compatible receiving cards and their exact configuration file, a video source, signal and data cables, power, and access to the saved setup. Prepare NovaLCT and USB for irregular displays.
Define pixel width and height, each port path, source frame rate and bit depth. At 8 bits, the official page specifies 1920×1200 at 60 Hz; at 12 bits, 1440×900 at 60 Hz. A maximum dimension does not permit any width/height combination.
Basic preparation
- Record the model, version and current map; back up the configuration and correct receiving-card file.
- Choose a supported source resolution. For custom EDID, the manual uses Advanced Setting > EDID Resolution and Apply; then check the actual output sent by the computer.
- For a regular display, configure Screen Setting: rows, columns, first-port loading and Data Flow to match the cabling. Quick configuration requires loading and direction consistent with the manual.
- For an irregular path, configure through NovaLCT over USB. Compare the map with physical wiring before changing cabinet parameters.
- Use Display Control to compare Test Pattern with Normal and check Black Out or Freeze. Save validated settings to receiving cards when they must survive a power cycle.
The LED test pattern fills the wall, but the presentation is cropped. What should I check?
A test pattern does not verify the source content size or position. Compare the actual computer output with the canvas and map, then check Offset Position. Display area plus offset must fit within the graphics-card output resolution.
EDID advertises a format to the source; it does not automatically fit all content to the wall. Prepare the canvas and scaling at the source or an appropriate processor, and check the result using a reference image.
Request a test image with a visible border and reference labels: the intended area should remain correct with actual content. If media does not match the map, we can evaluate content adaptation or upstream processing before changing receiver settings.
Why does a configuration stop fitting after switching to 10 or 12 bits?
The manual states that both 10 and 12 bits halve loading capacity compared with 8 bits. Recalculate the system and each path before changing modes; a connected cable is not sufficient.
The four port limits cannot be added to override device input and loading limits. Verify format, frame rate and receiving hardware in the same mode planned for operation.
Does quick configuration handle every wiring layout?
No. In quick configuration, the initial active ports must load equal cabinet counts, in multiples of rows or columns; the last port may load fewer. Each path must follow the configured direction, with the first port starting the physical connection.
The manufacturer directs irregular screens to NovaLCT. If columns are reversed or skipped, compare mapping and wiring before loading a different receiving-card file.
How can we switch computers while keeping the LED configuration consistent?
Agree on an output format and test each computer before the event. The manual’s EDID setting configures the resolution requested from the graphics card; then verify its actual output and fit within the map.
We can evaluate upstream switching or processing to normalize sources and prepare presentation backup. The proposal should define source changes and the picture reaching the controller during each change; separate inputs alone do not establish a clean transition.
The picture was correct but changes after power-up. Which configuration should we check?
One possibility is that the correct parameters were not saved to the receiving cards. The manual distinguishes importing a cabinet file into the controller from Save to RV Card, which retains current screen parameters on the receiving cards after power-off. The symptom alone does not establish that cause.
With the system identified and a validated configuration, we can review what was applied and saved. Preserve original files and also record the actual source output; do not try another panel’s file. We can scope preparation, an operator, an off-show startup rehearsal, and recovery using the correct files and units.
Troubleshooting by symptom
| Symptom | Check | Next decision |
|---|---|---|
| Black display | Video availability, Display Control set to Normal, brightness and active ports. | Distinguish a missing input from blocked output. |
| Cropped image | Actual format, canvas, map and Offset Position. | Adjust content without treating EDID as a scaler. |
| Scrambled columns | Data Flow and physical order from the first port. | Correct a map that does not match wiring. |
| Changes do not persist | Check saving to receiving cards after validation. | Distinguish temporary adjustments from retained settings. |
Limits and precautions
Documented power: 100–240 V AC, 50/60 Hz; rated consumption is 16 W. This is not the power requirement for the entire LED wall.
Do not choose a cabinet file by pitch or brand alone. Preserve the original and verify the tile, receiver and revision before writing. Do not begin troubleshooting with a reset or update.
The model supports port redundancy and master/backup modes. These require a compatible design and a planned failure test; UART control or a video cascade alone does not establish working redundancy.
Preparing the enquiry with what is available
You can start with the purpose, city and approximate size. Add models, a pixel plan, cable photos and versions if available. Separate the venue contribution from the equipment and tasks you want to hire. Use the worksheet to record identification and test results.
Download identification and test TXT worksheet
Can I enquire before choosing a controller?
Yes. Tell us what content you want to display, on which surfaces and which part of the system is already arranged. We can help select equipment and services and complete models, dimensions and scheduling later. For an existing system, request the map and original files from the responsible person.
Other guides for comparing signal paths
Each guide applies to its named model and edition. Check system compatibility before combining equipment or transferring a procedure.
Manuals and editions
Check the stated model, edition and language at the manufacturer’s source. Verify the document edition and installed software version separately.
MCTRL660 · User Manual V1.4.4
Open official documentation ↗MCTRL660 · Specifications V1.4.3
Open official documentation ↗
Documentation consulted
Document adaptation: October 29, 2026. Check your system model and version before applying changes.
