info@eventosglobales.com.arWhatsApp · +54 9 11 5626-6200

← Back to guides and resources

Reference documentation · Video, LED and playback

AJA FiDO-T-12G / FiDO-R-12G: prepare the SDI fiber link

Prepare the path between camera, control and destination with the correct SDI/fiber pair. Separate transport, conversion and reception testing.

These guides help you prepare and check your production systems. Documented models are technical references; enquire about the equipment and services we can prepare for your project.

Equipment, integration and event preparation

Tell us which signal must arrive and what your production supplies. Ask Eventos Globales about video equipment rental, purchase and integration, preparation and operation in Argentina. Start with an idea and diagram; the proposal identifies equipment, cable routes, access, tasks and responsibilities.

Connect separate event locations

For a camera-to-control link, distant display or venue fiber integration, share source, destination, estimated distance and connection photos. Assess a transport setup or integration with existing equipment, installation and picture/audio checks. Define any required format conversion as an additional stage.

Model and scope

This guide covers FiDO-T-12G, transmitting SDI to single-mode LC fiber, paired with FiDO-R-12G, receiving that fiber and outputting SDI. The receiver’s two outputs carry the same signal, not two independent channels.

The FiDO family includes other versions, connectors and capacities. Check full part numbers at both ends. A connector adapter does not establish optical compatibility or format support.

Connections and limits that matter

Signal path
SDI source → FiDO-T-12G → single-mode LC fiber → FiDO-R-12G → SDI destination. Verify suitable power and SDI cabling at both ends as well as the optical link.
Format and color
The units support 12G/6G/3G/HD/SD-SDI as specified. They pass SDI metadata including HDR; that does not scale resolution, change frame rate or perform tone mapping.
Distance and fiber
AJA specifies up to 10 km over single-mode fiber. That product reference is not a guarantee for any reel: losses, splices, patch panels, cleanliness and path condition need verification.

Prepare the system in stages

  1. Record exact models, source/destination formats, connectors, fiber, approximate length and power locations. Identify venue-owned portions and agree on access and a test window.
  2. Check the pair using a known signal, short SDI cables and compatible test fiber. Confirm picture, required audio channels and destination format readout before adding the long route.
  3. Protect the installed route from connector strain and bends outside specification. Trained personnel should inspect and clean using appropriate optical procedures; never look into fiber or connectors or use ordinary magnifiers to search for light.
  4. Test the complete installed route, including panels and final cables, at the event format. Check audio and final destination, record results and rehearse the contingency path. Disconnect and cap ends when appropriate under the safe procedure.

Example event preparation

For a proposed camera position far from the control area, first verify that its output and the switcher input accept the same SDI format. Add the FiDO pair and fiber route without expecting transport to perform a format conversion.

If the destination needs HDMI, include a compatible additional converter and its limits as another stage. Plan the converters, fiber, terminations and power together, and agree on installation and testing of the complete route.

Troubleshooting: find the failing stage

If the table is wider than your screen, scroll it horizontally. You can also use the arrow keys with focus inside the table region.

SymptomWhat to checkHow to verify the result
No pictureCheck power, T/R direction, SDI input, fiber type and part numbers.Return to the known short link, then add one section at a time.
HD works but the required format failsCheck source/destination support and all SDI and optical sections.Test the exact event format; an HD test does not validate 12G.
Picture arrives but audio or color is wrongCheck embedded audio, format/metadata and destination settings.Compare with the source and verify every required channel and display condition.

Frequently asked questions

Do the receiver outputs carry different signals?

No. FiDO-R-12G distributes the same channel to both SDI outputs. Two independent signals require a different architecture.

Can I connect an HDMI source?

This pair uses SDI and fiber. An HDMI source needs an additional compatible conversion stage; check its format, audio and restrictions.

Does it convert HDR to SDR?

Passing HDR metadata is not tone mapping. Specify the required processing if the destination needs a different representation or format.

Will any LC FiDO work?

No. Identify version, rate, direction and fiber type. Do not mix single-mode/multimode or different capacities based on connector appearance.

Is 10 km guaranteed on my fiber?

Not automatically. The route and losses must be understood and tested; nominal length or continuity does not prove operation at the required format.

Quote the complete route and rehearsal

Compare a short test of the pair with the installed route, including panels and final cables. Record format, audio, power at both ends and venue access responsibilities. Define the failure the contingency should cover and rehearse that path. Check delivery at the agreed destination.

Rental, purchase and integration: starting information

Can I enquire without knowing the fiber or converters?

Yes. Start with city, date, locations, approximate distance and what you want to show or hear. Add photos or a diagram if available. Compare options and complete format, cable route and models with production.

How does an installed link differ from equipment supply?

Supply identifies units and accessories. An installed link may add cabling, venue integration and an end-to-end test; operation and contingency are agreed as specific tasks. State what your team already handles so the proposal covers the required scope.

Start with the route and required result

Share city, date, signal sources and destinations, estimated distances and available equipment or infrastructure. State equipment, integration, installation, preparation or operation needs. Missing details can remain to be defined. Contact arrives with Video and cameras selected; include the guide name in your message and review the draft before sending.

Worksheet for production and venue coordination

Download editable transport and reference worksheet (TXT)

Continue with conversion, switching or the other path

Sources and model documentation

Official specifications distinguish single-mode LC transmitter T and receiver R. Support identifies FiDO-12G series manual v1.4, released December 6, 2023. Compare full part numbers at both ends and the actual format.

Documentation consulted

Checked October 30, 2026: official specifications and support pages. The technical baseline comes from the kit; full manual review and checks of actual unit settings remain pending.

Let’s prepare your event system

Tell us what you want to show, hear or light and what your production already provides. Start with the idea and add models, dimensions and schedules later. Mention the model or guide in your message; the related service is selected in Contact.

Enquire about equipment and servicesView the related serviceEvent preparation guide