Define content, size and signal path. Identify panel and receiver, retain the map and agree a test with the intended camera.

These guides help you prepare and check your production systems. Documented models are technical references; enquire about the equipment and services we can prepare for your project.

Let’s prepare the stage or presentation image

Tell us what you want to show, audience positions and whether cameras will film the display. We can evaluate rental or purchase of an LED solution and prepare content, installation, configuration and operation for your event in Argentina. A room photo and approximate size let us start; equipment and installation are identified as the proposal develops.

Scope we can prepare

Agree display and processing, content and playback, support and installation, power distribution, configuration and operation separately. Identify who supplies and approves each part. For filmed work, allow time and an owner for the camera test. BP2 V2 references guide preparation; the proposal identifies the system and units that can be offered.

Which panel does this guide cover?

The ROE Visual Black Pearl BP2 V2, also written BP2V2, is an indoor LED panel used for film, broadcast and event displays. This guide covers the standard panel. The similar BP2 V1 and creative corner/triangle modules have separate specifications.

Panel variants and connections

Image and panel
2.84 mm pitch; 176 × 176 pixels; 500 × 500 × 90 mm; 9.35 kg per panel. Reference maximum calibrated brightness: 1500 nit.
Refresh and revision
BP2 V2: 1/8 scan, 7680 Hz and 16-bit grayscale. These do not identify the receiver firmware or guarantee artifact-free footage at every camera setting.
Electrical reference
Published reference: 190/95 W maximum/average per panel on the current product page and 2023 brochure. Other brochure dates show different values. Check the unit label, revision and manual; voltage, connectors and electrical chaining are defined by that documentation and the feeder design.
Data and control
The 2023 brochure lists MVR/Brompton. Identify the installed receiver and fixture definition before choosing processing and cabling. Video, panel data and power are different paths; prepare a plan for each.

What the system needs

Provide a compatible processor and receiver configuration, tested data/video cables, a pixel map, qualified power distribution and the correct support hardware. For camera work, include the camera format, shutter settings and a documented synchronization plan.

Hanging and stacking require their own approved arrangement, accessories and ballast where applicable. A brochure maximum is conditional on the matching ROE hardware and installation; do not treat it as permission for a new layout.

Calculated example, not a supplied configuration: a 4 × 2 m rectangle made from 500 × 500 mm cabinets has 8 columns and 4 rows. At 176 × 176 pixels per cabinet, the canvas is 1408 × 704 pixels (991232 pixels). Check the real map and processor capacity for the chosen format.

Prepare the system

  1. Record BP2 V2 label, receiver model, firmware, processor version and patch order. Save the current project before changing assignments. Keep V1 and V2 configuration files clearly separated.
  2. After qualified personnel approve support and power, check the video input and blackout state. Compare detected panel count with the patch plan. For Tessera, inspect strings in Add Fixtures From Network before association.
  3. During rehearsal, show a border, panel identifiers and solid colors at suitable brightness. Check the intended camera feed as well as the panel viewed directly; record settings and restore the planned content.

Technical questions and show decisions

Can a BP2 V1 file be used to prepare a BP2 V2 wall?

The shared pitch does not validate the receiver configuration. Confirm the V2 label, receiver platform and approved fixture/cabinet definition. The official comparison identifies different scanning and refresh specifications between generations.

Keep the original project and check a controlled test arrangement before applying any new mapping. Do not send a V1 receiver file to a V2 wall or change driver settings solely to match a specification number.

A replaced panel is detected but stays black. What should I check?

Check the selected source, blackout and the expected panel count first. Compare the physical chain and saved positions; inspect accessible data cables. Substitute one known-good compatible lead during a planned test if needed.

On a Tessera system, detection and association are separate: a replacement must be assigned to the intended canvas position. Confirm its online status and association before assuming failure. Avoid opening, factory reset or firmware update as a generic first step.

Why can the camera show scan lines even though the panel specification says 7680 Hz?

Record the actual camera frame rate and shutter speed/angle, processor format and sync status. The published LED refresh rate is not the video frame rate and does not establish exposure compatibility by itself. Compare a simple static pattern and the intended content during rehearsal.

On supported Tessera SX40/S8 systems, the documented ShutterSync camera workflow uses Genlock and camera exposure settings. Verify software and panel support before using it; do not copy generic HFR examples as BP2 V2 limits. Change one setting at a time and assess the actual recorded image.

How do we choose screen size and detail for a show with an audience and cameras?

Start with what people need to see: stage visuals, live video, or presentation text. Review dimensions, audience positions, light on the screen, and sample content. Pixel pitch alone does not establish a suitable reading distance; check text from the intended viewing positions.

For recording or streaming, agree a test with the intended camera, exposure and processing. We can compare content, size and position using a sample. If the environment needs outdoor protection, choose another system documented for that use.

What should I include when asking about screen rental for the show?

Start with the venue, what you want to show and whether cameras are involved. Add date, duration and approximate size when known. Mapping and configuration follow evaluation of project equipment and tasks.

We can evaluate display and processing supply, or add content preparation, installation, configuration, rehearsal and operation. Identify your team’s contribution. Define with production which interruptions the fallback must cover and how recovery is checked.

Symptom and next check

ROE Visual Black Pearl BP2 V2
SymptomCheckNext step
V1 file proposed for V2Label, receiver and approved definitionUse the matching configuration.
Detected but blackSource, blackout and fixture associationReview the saved project and intended position.
Camera linesExposure, sync and supported processor featuresRehearse with the actual camera settings.

Power, environment and installation

The current page specifies the standard indoor panel, IP40 and operation from −20 to +45 °C. Review environment, cable condition, protection and power distribution against the unit manual with qualified personnel before installation.

Protect LED edges and record panel condition on arrival. After moisture exposure or prolonged storage, define the necessary inspection and preparation against the manual with qualified personnel before power-up; conditioning requires the procedure applicable to that unit.

Have qualified personnel determine feeder loading and mechanical limits for the complete assembly. This guide does not authorize climbing or work under suspended loads. Stop for damaged connectors or overheating and isolate power before service.

Prepare the worksheet and image test

The existing worksheet records unit, versions, signal, ports and people responsible. Leave details undefined where needed. For camera work, add these points to your copy or production plan:

  • Intended camera, lens, position and framing.
  • Video format, exposure, received reference and supported features.
  • Pattern and content: border, text, skin tones and motion under intended lighting.
  • One change at a time; starting state, recorded result, final setting and acceptance owner.

Download the existing LED system worksheet (.txt)

The worksheet downloads blank. Retain your copy and describe the goal in Contact. Opening the form or preparing a draft does not send an enquiry.

Continue through the system components

Choose the guide for the identified platform. A panel reference does not identify its installed receiver or establish a compatible equipment combination.

Official documentation and revisions

The product page and 2023 brochure describe standard BP2 V2. Check document date, label and unit manual; verify nominal values and accessory limits separately. Sources open on the manufacturer’s site.

Documentation consulted

Review: October 30, 2026. Official product and June 30, 2023 brochure specification table/accessory notes, fixture connection and ShutterSync consulted. Nominal geometry only; no camera test, installation or verified unit.