info@eventosglobales.com.arWhatsApp · +54 9 11 5626-6200

← Back to guides and resources

Reference documentation · Event planning

StageRight ME-1000AS/AT: define supports, decks and layout before requesting the system

A riser inquiry may describe the finished surface while omitting its support system. For modular-stage planning, list supports, decks, braces and interfaces separately. This guide selects an ME-1000AS reference and compares AT where identification differs, without treating the ME-1000 name as a complete assembly.

These guides help you prepare and check your production systems. Documented models are technical references; enquire about the equipment and services we can prepare for your project.

Model and documentation reference

Selected documentary reference: ME-1000AS Arena Style part 314210, with 24–36in adjustable height in its table. Comparison ME-1000AT All Terrain Style part 314410 lists the same interval in a separate packet. Matching height establishes no identical assembly or fasteners. Both documents concern support systems; identify project decks and other components separately.

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed

Event application

For a conference, performance or awards event in Argentina, begin with area, intended height, circulation and planned stage items. Add identified components and owners of receiving-floor, access and assembly review. A deck list alone resolves neither number nor placement of supports. Layout and venue review precede a confirmed component proposal; this documentation establishes no stock, completed installation or project load capacity.

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed

Keep these references distinct

Keep these references distinct
PartDocumented recordProject question
Selected AS314210: ME-1000AS, 24–36inDoes the actual support match this code and condition?
Comparison AT314410: ME-1000AT, 24–36inIs AT documented or was an AS reference copied?
LocatorAS quick pin/faspin versus AT spring pin procedureWhich actual retention/assembly needs review?
Deck / supportDifferent system componentsWhich panel, orientation and supports match the full plan?

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed · StageRight ME-1000AT · packet EN · filename20161209 · metadata2013 · revision unconfirmed

Relate every deck to supports and locators

A plan should trace each deck to supports, interfaces and corresponding locator. The packets contain specific bridging arrangements, not permission to remove supports from arbitrary designs to save parts. Review AS examples and AT drawings under their own variant. Prepare a complete component list and mark unresolved interfaces for competent reconciliation of plan, parts and use.

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed

Arena Style and All Terrain still need actual-site review

The manufacturer describes AS for level environments and AT for variable contours. That establishes neither ground capacity, stability of the proposed assembly nor suitability at a specific location. Locator retention also differs between variants. Record observed venue conditions and component identity; variant name, hook appearance or matching height provides no compatibility approval.

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed · StageRight ME-1000AT · packet EN · filename20161209 · metadata2013 · revision unconfirmed

Prepare by component and interface

  1. Identify AS/AT and each support code. Keep 314210 as the selected documentary reference; match other actual units to their own table/instructions.
  2. List decks, supports, braces, locators and access/protection separately. Retain insufficiently identified components as unconfirmed.
  3. Draw arrangement, orientation and interfaces. For proposed bridging, submit the complete plan and documentary correspondence; infer no removable parts from a partial drawing.
  4. Record required height and receiving-floor conditions for responsible review. Distinguish component nominal height from assembly leveling/use conditions.
  5. Agree on inspection/rehearsal owners and pending items. Perform no assembly, support movement, pin release, leveling, jam-nut adjustment or load testing to fill this sheet.

StageRight ME-1000AS · packet EN · filename20161209 · revision unconfirmed · StageRight ME-1000AT · packet EN · filename20161209 · metadata2013 · revision unconfirmed

Frequently asked questions

Does ME-1000 alone identify a complete stage?

Reviewed packets describe AS or AT supports. Decks, layout, accessories and venue conditions need identification for the assembly.

Are 314210 and 314410 the same because height matches?

That equivalence is undocumented. They belong to AS and AT respectively; matching height replaces no variant/retention identification.

Can I copy the AS locator procedure to AT?

Documents distinguish AS quick pin/faspin from AT spring pin. Review actual variant and complete instructions.

Does bridging allow removing supports wherever convenient?

Do not infer that. The manufacturer shows specific layouts/locator combinations; proposals require complete plans and relevant review.

Does All Terrain mean any ground is acceptable?

No. Name and variable-contour description establish neither ground capacity nor installation approval. Actual site conditions require separate review.

Continue the layout and brief

Download the ME-1000 component and interface matrix

Identified official documents

Existing official English ME-1000AS/AT packets SHA verified; both filenames end 20161209. AS metadata dates to 2016 and AT to 2013, not a claimed printed revision date. All 12-page text read for each; PDF 5/8/10 of both visually inspected. Other diagrams are not claimed visually reviewed. Select the exact variant below.

Plan the stage for your event

For a modular stage in Argentina, share city, venue, use, layout, required area/height, circulation and planned equipment. For identified ME-1000 components, include AS/AT, codes and documents. The inquiry scopes review/proposed installation; configuration, availability and scope need confirmation.

Enquire about equipment and servicesView the related serviceEvent preparation guide