ZONE SURVEY WORKSHEET — XMV4280 Blank draft. Complete with the venue representative. Date, venue and program: Installed-system lead: Event signal and operation lead: Full model, suffix and firmware: Processor/editor and available documentation: Source → physical input → channel → zone: Initial SRC / MUTE / ATT state and saved configuration: Each speaker model and documentation: Line type, voltage/taps or impedance confirmed by: Route and connections documented by: Indicators and exact alert number: Speech/music result per destination: Pending items and responsible person: Record observed facts; do not infer configuration from a photo. Line inspection and intervention belong to responsible staff with the system isolated according to its manual.